How ElaraSilk Documents Custom Silk Projects
A project becomes a public case only when its requirements, approvals, production record and publication permission can be checked.
- ✓ Real order and approval records
- ✓ Results limited to the stated project conditions
- ✓ Names, artwork and photos used only with permission
Eight Records Behind a Publishable Project
These records separate what was requested, approved, produced, checked and permitted for publication.
Customer names, logos, quantities, dates and results are not published here until the related evidence and permission are complete.
Defines the product, intended use, quantity, target date and details still open before sampling.
View Products
Records composition, weave, momme, width, color or print, finish and the approved reference.
Compare Fabrics
Connects the artwork version, repeat or placement, color reference and approved proof.
View Printing
Links the approved sample to dimensions, construction, labels, packaging and written comments.
View the Process
States the order or batch, final quantity, approved changes and actual production period for that project.
View the Process
Shows which requirements were checked against the approved sample, tech pack or order.
View the Factory
States only results backed by project records and keeps every number within that order's conditions.
View Process
Defines whether names, country, logo, artwork, photos, quantities, dates and comments may be shown.
Contact ElaraSilkHow to Read a Future Case
A finished photo is only the starting point. Read the conditions, decision trail and scope of every result.
Match the Conditions
Compare the product, material, construction, artwork, quantity, packaging and approval route with your own project.
Follow the Decision Trail
Look for what changed during sampling, what the buyer approved and which checks followed into production.
Check the Scope of Every Claim
Quantity, timing, inspection findings and results apply only to the stated project. Confidential details may be omitted.